SL NOCLIENTPRIME CONTRACTORPROJECT DESCRIPTIONDURATION
1Cairn Energy - S.YanamMastek EngineeringProvision for Civil Works for Froth Vessel and Heat Exchangers at RAVVA2014
2Chennai Petroleum Corporation Limited, Chennai, IndiaMastek EngineeringRepair / Maintanance woks for kerosene and Diesel storage tanks at CPCL CBR-Nagapattinam2014
3Indian Oil Corporation Ltd, Chennai, IndiaMastek EngineeringMechanical works for existing product storage tanks and allied works at Sankari Terminal2014-2015
4M/S GAIL INDIA LTD, Rajamundry (KG Basin), IndiaMastek EngineeringLaying of 12" x 12.7 kms Under ground cross country PipeLine from ONGC Terminal to Odalrevu Near Amalapuram.2014
5 Indian Oil Corporation Ltd, Chennai, IndiaMastek EngineeringProvision of Mechanical Seals, Artuculated Drain, Modification of Gauge Well on Product storage tanks and allied works at TrichyTerminal2014-2015
6M/s. Chennai Petroleum Corporation Limited, Chennai, IndiaMastek EngineeringLaying of pipeline from the tank Nozzles of SKO, HDS tanks to the proposed IOCL pumping station at CPCL-CBR, Nagapattinam2013-2014
7Indian Oil Corporation Ltd, Chennai, IndiaMastek EngineeringModification of Existing Product pipeline to accommodate ROSOV & DBBV etc and supply & laying of instrument Air pipeline at Trichy Terminal &Narimanam Terminal.2014-2015
8GAIL India Ltd,IndiaMastek EngineeringLaying of 12" pipeline - 180 Mtrs near 31.0 kms chainage and associated works for GAIL VSPL LPG pipeline system.2014-2015
9Indian Oil Corporation Limited, Chennai, IndiaMastek EngineeringSupply ,Fabrication ,welding Installation of Sprinkler and foam conveying system for petroleum storage tanks(CRV/FRV Tanks) at Madurai Terminal2014-2015
10M/s. Gail (India) LTD,Mastek EngineeringPipeline Repair/Replacement and Supply Material2014-2015
11M/s. Gail (India) LTD,Mastek EngineeringRe-routing/lowering of 18" Gas pipeline near SV-3B Bangalore2014-2015
12GAIL India Ltd,IndiaMastek EngineeringReplacement of 850m of 8" P/L from Odalarevu to Bodaskuru2014
13GAIL India Ltd,IndiaMastek EngineeringCarrying out HDD and Hookup jobs across Kattar River in 6" NLM-KMP Pipeline of Gail,CB2014-2015